Waterproofing of pile heads with cold applied self-adhesive membranes

1 Reprofiling
KÖSTER Repair Mortar R4
2 Reprofiling
KÖSTER NB 1 Grey
3 Corrosion protection
KÖSTER Z 1
4 Corrosion protection
KÖSTER Z 2
5 Primer
KÖSTER KBE Liquid Film
6 Waterproofing Layer
KÖSTER KSK SY 15

Damage in existing buildings is often caused by leaking pile foundations. Water can enter the building through the construction joints or make its way along the reinforcement steel. The waterproofing of pile heads has to withstand heavy loads from the whole building and needs to be easily connected to the area waterproofing.

At first, all non-load bearing materials and separating substances have to be removed from the surface of the pile head. After that, the surface has to be levelled and reprofiled with KÖSTER Repair Mortar or KÖSTER Repair Mortar R4. This reprofiling must also include the installation of a fillet adjacent to the pile head. KÖSTER NB 1 Grey is used to waterproof the pile head.

Mineral corrosion protection for the steel reinforcement bars is carried out with a first layer of the polymer modified special slurry KÖSTER Z 1 and a second layer of KÖSTER Z 2. KÖSTER Z 2 is red pigmented and allows a visual control of the application.

The waterproofing on top of the blinding layer is made with KÖSTER KSK SY 15. KÖSTER KBE Liquid Film is applied as primer on the entire surface as well as on all overlaps around the pile head. Protect the waterproofing layer from mechanical damage when continuing with the application.

Always adhere to the specifications in the respective Technical Guidelines.

 

Back

Top
Albania Austria Bosnia and Herzegovina Brasil Bulgaria China Croatia Czech Republic Denmark Finland Germany Ghana Greece Hungary Italy Japan Kazakhstan Kuwait Latvia Lebanon Macedonia Mexico Netherlands New Zealand Norway Panama Poland Portugal Romania Russia Senegal Serbia Slovakia Slovenia South Africa Spain Thailand Turkey Ukraine United Kingdom United States of America